- Real Estate Projects[1]
- Construction Services[2]
- Briefcases[1]
- Alternative Energy Generators[1]
- Diesel Generators[4]
- Power Distribution Equipment[5]
- Mining Machinery[6]
- Steel Pipes[5]
- Pressure Vessels[1]
- Other Machinery[1]
- Other Material Handling Equipment[2]
- Cranes[4]
- Microwave Ovens[1]
- Anchors[1]
- Cast & Forged[1]
- Men's Shirts[1]
- Metal Electroplating Machinery[1]
- Keyboards[1]
- Stacking Racks & Shelves[1]
- Contact Person : Mr. Zhao Jack
- Company Name : CATIC Beijing Co., Ltd
- Tel : 86-10-84808882
- Fax : 86-10-84971129
- Address : Beijing,Beijing,7th Floor, CATIC Plaza, No. 18 Beichendonglu, Chaoyangqu
- Country/Region : China
- Zip : 100101
Cubicle Fixed AC Metal-clad Switchgear
Detailed Product Description
XGN66A-12 Cubicle Fixed AC Metal-clad Switchgear is a latest version of high voltage complete set of electric apparatus for satisfying national standard GB3906 3-35kV alternative current metal-clad switchgear and specifications of DI404 indoor alternative current high voltage switchgear ordering specifications issued by Ministry of Electricity Power, as well as IEC298Above 1kV to 52kV alternative current metal-clad switchgear and control-switchgear specifications. And it has 5-protective functions.
This switchgear is a kind of indoor complete set apparatus with 3-10kV three phase alternative current 50Hz single busbar segment, used for power transmission and distribution, and meanwhile having controlling, protecting and monitoring functions. It is used in places, such as power plants, substations, Industrial and mining enterprises, high buildings, etc. And it can be combined with ring main unit used in some substations and it features:
*A series of vacuum circuit breaker, such as degrees of 12kV, 40kA, etc.
Could be fitted with.
*A kind of specified designed switchgear in order to reduce occupied area
of substation.
*Combination with ring main unit.
*Simple structure but reliable machinery interlock for antierror
operation, and operation is easy.
*Each functional compartment is separated, which can effectively resist
trouble to expand with individual pressure release passage.
*Insulation distances and cable terminal contact could be watched
through watching window.